 Panel system
 Box system
 Frame system

 Conventional building system
 Cast in situ formwork system
 Table or tunnel formwork
 Prefabricated system
 Composition system

 Timber
 Steel
 Cast in situ concrete
 Precast concrete

 Linear
 Skeleton
 Planar
 Planar systems
 Three dimensional box systems

 Component manufacture and sub-assembly
 Non-volumetric sub-assembly
 Volumetric pre-assembly
 Modular system

 Pre-cast concrete framing
 Panel and box systems
 Steel formwork systems
 Steel framing systems
 Prefabricated timber framing system
 Block work system

 Volumetric
 Panellized
 Hybrid
 Subassemblies and components
 Non-off-site-Modern Methods of Construction

 Pre-cast concrete-framed building
 Pre-cast concrete wall system
 Reinforced concrete building with pre-cast concrete slab
 Steel formwork system
 Steel-framed building and roof trusses

 Site intense kit part
 Factory made module
 Hybrid

 Volumetric system
 Panellized system
 Hybrid system
 Sub-assemblies and component system
 Modular system

1) Frame System (pre-cast or steel)
2) Panellised System
3) Onsite fabrication
4) Sub-assembly and components
5) Block work system
6) Hybrid System
7) Volumetric and Modular System