HOME

 

Philippines Floorplan Office

In today's real estate Philippines floorplan office marketplace, office space users demand flexible space to accommodate their dynamic organizations.

Providing designs to accommodate that need, especially with large-scale corporate fit-outs, has never been easy.

But a new design method developed by Architects Philippines floorplan office has proven to be an effective means to minimize costly contractor change orders during construction, while providing additional flexibility well into the future.

In the traditional approach, the architect Philippines floorplan office identifies the client's requirements, develops design standards for all the elements of the office, and provides detailed drawings showing final locations and arrangement.

This is all typically done a year or more in advance of the client's move-in date on a small project and up to three or four years ahead of the move-in date on a large project.

Unfortunately, this methodology is not well suited to designing Philippines floorplan office interior fit-outs for large dynamic companies, which often must defer final decisions about workspace layouts until shortly before move-in due to the effects of changing markets and related staffing issues.

Preparing final workspace layouts earlier in the process than is practical typically results in costly changes to the plans later.

By contrast, a strategic design Philippines floorplan office approach can be employed that delays detailed design decisions until a short period of time before move-in. In this alternate approach, designers develop a strategic program based on the following information: headcounts by department, workplace standards (i.e., numbers of offices and workstations) and the mix of those standards throughout the entire occupancy.

From that, a universal floor plan is created for the entire occupancy along with a building stack which shows the locations of each department.

These plans allow adequate space for the headcounts with an average mix of workplace standards, providing for maximum flexibility as the move-in date approaches. 

Technical areas, including pantries, filing and copy rooms, mechanical, electrical and information technology closets, are located vertically within the stack of floors adjacent to the building Philippines floorplan office cores to maximize efficiency.

 

For more info about Philippines floorplan office;

 

 
(For Manila and surrounding)
American Design Construction
#92 Ordoņez St. corner Maroon St.
Concepcion Dos, Marikina City
 
 
 
 
(For Cebu, Bohol, Negros, Leyte)
ET & p Design & Construction
#888 Katugasan, Casili
Consolacion, Cebu
 
 
 
 
(For Baguio and surrounding)
RA Gacoscos Construction
#99 Greenwater Village
Baguio City, Philippines
See website
 
 
 
 
(For Davao / Mindanao)
Raul G. Anuada (Realtor & Civil Engineer)
Unit 162, 16/F Landco PDCP Corporate Center
J.P. Laureal Ave., Bajada
Davao City
 
 

 

-------------------------------------------------------------------------------------------------------

contractors   construction   homes   house   builders   build   building   architect   remodeling   remodel   renovating   interior   floorplan

floor_plan   house_floor_plans   design   office